New announcement. Learn more

PROJECTS

Our commercial structural steel fabrication projects

We work on commercial structural steel fabrication projects throughout Auckland and beyond. Take a closer look at some of our projects. 

WAIKATO WASTE WATER TREATMENT PLANT

Two new buildings for the chemical plant and the pump room. Supply and install top coat painted steel.

AUCKLAND CITY RAIL LINK

Fabricate and install:

  • 3 x lift shafts

  • Rail corridor PSD steel

  • 600SHS custom beam

  • Awning beams

  • Parapet steel

  • Hvac support frames

  • Victoria Street station

  • Ticket office suspended frame

SKY CITY AUCKLAND

New skylight CHS frames – Fabricated, painted and installed.

HAMILTON WORKING MENS CLUB

40x40 metre CHS structure installed over bowls turf.

KAITAIA POOL FACILITIES

80 tonne CHS building over swimming pool structure.

NIWA RUAKAKA KING FISH POND BUILDING

40 tonne CHC building fabricated, galvanised and installed.

YARROW STADIUM NEW PLYMOUTH

West Stand – Fabricate and install new roof structure.

AUCKLAND INTERNATIONAL AIRPORT 

Pedestrian walkway. 80 tonne of rolled and welded CHS pipe fabricated, painted and installed.

AUCKLAND ZOO

Fabricated and installed Ø323 CHC perimeter posts. Fabricated and installed 2 x tiger bridges.

FORD LOFTS

Earthquake Strengthening, floor and wall support steel.